Milk Creek Project 2012 – As Built Drawings

Download
Milk_Creek-As_Built_Drawings-January2013.pdf
File Size8.2 MB
DateJanuary 14, 2013
Downloads505
Version1.0
Final "as built" drawings of the log structures installed in 2012 and designed to protect streambanks, enhance fish habitat, and improve water quality.
Comments are closed.

Clackamas SWCD