Download
Milk_Creek-As_Built_Drawings-January2013.pdf | |
---|---|
File Size | 8.2 MB |
Date | January 14, 2013 |
Downloads | 505 |
Version | 1.0 |
Final "as built" drawings of the log structures installed in 2012 and designed to protect streambanks, enhance fish habitat, and improve water quality.
Comments are closed.