2017-2018 Annual Work Plan for CSWCD

Download
2017-2018-annual-work-plan-CSWCD-final.pdf
File Size2.3 MB
DateMarch 30, 2018
Downloads272
The District's annual work plan was adopted at a special meeting of the Board of Directors on June 20, 2017.   This plan contains the District's priorities for fiscal year 2017-2018 (July 1, 2017 through June 30, 2018) and compliments the priorities outlined in the Clackamas Soil and Water Conservation District’s 5-year plan.
Comments are closed.

Clackamas SWCD