Milk Creek Structures Endure First High Water Event

Recent heavy rainfall resulted in a sudden rise in the level of Milk Creek. This caused us to take a close look at how well the large vegetated log matrix...

Read More Milk Creek Structures Endure First High Water Event

Milk Creek Project: Greening Up Before Fall Rains Arrive

A quick inspection of the Milk Creek Project log structures shows grasses and willows sprouting, even though fall rains have not  yet arrived. Milk Creek...

Read More Milk Creek Project: Greening Up Before Fall Rains Arrive

Plant a Patch of Flowering Plants for Pollinators

Plant a patch of flowering plants to attract native pollinators like bees, butterflies, and beetles! The value these small creatures provide is extraordinary....

Read More Plant a Patch of Flowering Plants for Pollinators

Milk Creek Project: Water is Flowing in the Restored Channel

The contractor and engineers worked closely today to return Milk Creek to the old channel.  Stream riffles that existed before the project were restored....

Read More Milk Creek Project: Water is Flowing in the Restored Channel

Milk Creek Project: Surface Seeded and Bank Shaping Underway

What a difference a day makes! Topsoil was spread today and raked to provide good soil-to-seed contact.  Straw mulch was placed to help with germination of...

Read More Milk Creek Project: Surface Seeded and Bank Shaping Underway

Milk Creek Project: Final Grade Achieved Today

The remainder of backfilling the structure was completed today, topsoil was replaced, and smoothing of the restored upper bank was started.  Tomorrow, the...

Read More Milk Creek Project: Final Grade Achieved Today

Milk Creek Project: Upstream End Finished to Final Grade

Now we can see what the finished log jam system will look like!  Contractors finished packing soil on the upstream end and graded the surface back to the...

Read More Milk Creek Project: Upstream End Finished to Final Grade

Milk Creek Project: We See How It Will Look

More logs, more slash, more boulders, more rock, more soil!  Excellent progress was made today on the log jam.  The upstream end is just about completed with...

Read More Milk Creek Project: We See How It Will Look

Milk Creek Project: Adding Materials to the Engineered Log Jam

We abbreviate “engineered log jam” as ELJ. The photos collected today show the final length of the structure, and the progression of work as slash,...

Read More Milk Creek Project: Adding Materials to the Engineered Log Jam

Milk Creek Project: Last Base Logs Installed

The last base logs were added today and most of the cross-logs with root wads attached were added.  Today you can see how the project sweeps along the curve...

Read More Milk Creek Project: Last Base Logs Installed

Milk Creek Project: Log Jam Starts to Fill-in

Quite a bit more of the engineered structure became evident today as base logs and cross-members were extended farther downstream.  At the upper end, more...

Read More Milk Creek Project: Log Jam Starts to Fill-in

Milk Creek Project: Live Willows Added

Work today consisted of beginning to build up the roughness of the structure, because more friction means less erosive energy for flowing water.  This design...

Read More Milk Creek Project: Live Willows Added

Milk Creek Project: Making the Turn

More logs were placed today and we started to make the turn to follow the course of the stream.  In the photos below, you’ll find a few that show the...

Read More Milk Creek Project: Making the Turn

Milk Creek Project: Base Log Layer

Today the crew made great strides toward installing the base layer of logs in the large engineered log jam.  Trunks with roots attached were placed so the...

Read More Milk Creek Project: Base Log Layer

Milk Creek Project: First Logs Placed!

Today (Monday, August 27, 2012) the contractor placed the first logs on the mudstone stream bottom.  As we build the engineered log jam, logs with roots still...

Read More Milk Creek Project: First Logs Placed!

Milk Creek Project: Mobilization (gallery)

Our contractor — Aquatic Contracting, LLC — arrived on Thursday, August 23, 2012 to begin mobilizing equipment, hauling wood, and establishing...

Read More Milk Creek Project: Mobilization (gallery)

Clackamas County Lavender Festival!

A little rain couldn’t dampen the spirits of those who attended the Clackamas County Lavender Festival last weekend at the Oregon Lavender Farm. Although...

Read More Clackamas County Lavender Festival!

A Fishy Head Count

Ever wonder how many and what kind of fish are in your stream? Well, this summer the fish in tributaries to the Molalla River will swish their little tailfins...

Read More A Fishy Head Count

Possible project on Mt. Scott and Camas creeks

Clackamas County SWCD staff visited a potential project site today at North Clackamas Park. Two streams pass through the park: Mt. Scott Creek and Camas Creek....

Read More Possible project on Mt. Scott and Camas creeks

Photo by Lee Ko

You Can Help Our Struggling Pollinator Friends!

Did you know that one in three mouthfuls of food or drink requires the presence of a pollinator? Bats, bees, birds, butterflies, moths and other creatures are...

Read More You Can Help Our Struggling Pollinator Friends!

Now is the Time to Plan Your Streamside Planting

Now is the time to be thinking about planting trees and shrubs along your streamside area, otherwise known as the riparian area.  Healthy riparian areas have...

Read More Now is the Time to Plan Your Streamside Planting

Close Search Window