The last base logs were added today and most of the cross-logs with root wads attached were added. Today you can see how the project sweeps along the curve of the stream channel! We also had a visit by two deer curious about all the activity.
- One tree removed and will be reused in structure
- Bringing in log to place into structure
- Two deer visited the project site today
- Design engineer explains system to neighboring landowner
- Both project engineers were at the site today
- Project lead, contractor, and hauler confer
- Unloading more root wads
- Photo monitoring point will have to be moved
- Excavator getting serviced
- Moving log before placement
- Preparing to set log
- Preparing to set log
- Preparing for last run of base logs
- Handling root wad prior to placement
- Cutting lap joint and driving pin
- Drilling and driving
- Drilling and driving
- Patches supervises from a safe location
- Engineer explains log placement to operator
- Excavating slot to “key in” log into bank
- Sliding log into slot cut into bank
- Setting pin with bucket
- Bending pin with tooth of bucket
- Bending pin with bucket
- Curving nature of system is now evident
- Stream channel will return to where team stands
- It looks like a log jam!