Today the crew made great strides toward installing the base layer of logs in the large engineered log jam. Trunks with roots attached were placed so the root wads will add roughness to the bank, slowing the erosive force of the stream.
Today the crew made great strides toward installing the base layer of logs in the large engineered log jam. Trunks with roots attached were placed so the root wads will add roughness to the bank, slowing the erosive force of the stream.
No items, feed is empty.