Today (Monday, August 27, 2012) the contractor placed the first logs on the mudstone stream bottom. As we build the engineered log jam, logs with roots still attached will be placed on top of this first layer of logs. Stay tuned for more photos!
Today (Monday, August 27, 2012) the contractor placed the first logs on the mudstone stream bottom. As we build the engineered log jam, logs with roots still attached will be placed on top of this first layer of logs. Stay tuned for more photos!
No items, feed is empty.