Our contractor — Aquatic Contracting, LLC — arrived on Thursday, August 23, 2012 to begin mobilizing equipment, hauling wood, and establishing sediment control practices.
- Milk Creek site in February, 2012
- Loading wood from storage site
- Wood being delivered to project site
- Unloading wood at the project site
- Milk Creek has a mudstone bedrock bottom
- The team deliberates
- Conference with contractor
- Harvesting willow cuttings
- Diversion channel established August 23, 2012
- Photo monitoring point on 4×4 post
- Two squirrels in lower left corner at wood storage site
- Human in the night at storage site