The contractor and engineers worked closely today to return Milk Creek to the old channel. Stream riffles that existed before the project were restored. Great progress was made on engineered log jams downstream to help protect that bank from flow that may be deflected off the large structure upstream.
Almost all work has been completed on the main structure. The crew is cleaning up and working on three smaller engineered log jams just downstream.
- View as work started this morning
- Engineer and operator confer
- Beginning to remove diversion
- Removing log from diversion
- Diversion channel breached and flow returns
- Flow is returned to the main channel
- Jenne is happy to see the stream returned to the channel
- Reclaimed gravel used to restore riffles
- Reclaimed gravel also added to main structure
- Returning reclaimed gravel to main structure
- Removing plastic liner from diversion channel
- Filling in the diversion channel
- Installing engineered log jam
- Engineered log jam with slash added
- We had some extra help today
- Restored riffles (the gray spot is bedrock)
- Main work on project is just about done