Quite a bit more of the engineered structure became evident today as base logs and cross-members were extended farther downstream. At the upper end, more slash, cobbles, and logs were packed into the structure, with boulders placed to help hold everything in place.
![](https://i0.wp.com/conservationdistrict.org/wp-content/uploads/DSC01439-Custom.jpg?fit=800%2C600&ssl=1)