Weir Removal…a dam good idea!

Weirs are barriers built in a stream to pool water for irrigation, recreation, and sometimes to generate power.  They are found in many of our local streams,...

Read More Weir Removal…a dam good idea!

CCSWCD

Giant Fish is a Big Draw at Local Event

What do a 14-foot-tall fish, a table full of local historical artifacts, and a clothesline of fish-print shirts have in common? They were all found at the Milk...

Read More Giant Fish is a Big Draw at Local Event

Restoration in Milk Creek Continues…Fish are Thrilled

In 2012 the Clackamas Soil and Water Conservation District implemented a stream restoration project on Milk Creek, a tributary and major stream in the Lower...

Read More Restoration in Milk Creek Continues…Fish are Thrilled

Follow That Fish to Milk Creek!

If you see a 14-foot tall Chinook salmon travelling down the highway, follow it to Camp Adams and the Milk Creek Watershed Celebration!  Claudia the Chinook...

Read More Follow That Fish to Milk Creek!

Pebble Count Conducted at Milk Creek Site

Last month we conducted a pebble count on Milk Creek at the site of the vegetated log matrix that was built last summer. A pebble count is a common method...

Read More Pebble Count Conducted at Milk Creek Site

Milk Creek: Spring Checkup on Vegetated Log Matrix

With a contract crew on site today to treat weeds, it was the perfect time to take a look at the condition of the vegetated log matrix the Clackamas County...

Read More Milk Creek: Spring Checkup on Vegetated Log Matrix

Time to Plant Your Streamsides

Spring is fast approaching and the urge is strong to get outside and dig in the soil! We have the planting bug, too, at the Clackamas County Soil and Water...

Read More Time to Plant Your Streamsides

Milk Creek: Three Weeks of Construction in Three Minutes

Watch this time-lapse video to see the construction of a large vegetated log matrix structure. Construction occurred in Август and Сентябрь 2012 and took 12...

Read More Milk Creek: Three Weeks of Construction in Three Minutes

Milk Creek Project Update And Next Steps

Milk Creek is home for several Molalla basin fish species: Chinook and Coho salmon, winter steelhead, cutthroat trout, and Pacific lamprey. A limiting factor...

Read More Milk Creek Project Update And Next Steps

Milk Creek Structures Endure First High Water Event

Recent heavy rainfall resulted in a sudden rise in the level of Milk Creek. This caused us to take a close look at how well the large vegetated log matrix...

Read More Milk Creek Structures Endure First High Water Event

Milk Creek Project: Greening Up Before Fall Rains Arrive

A quick inspection of the Milk Creek Project log structures shows grasses and willows sprouting, even though fall rains have not  yet arrived. Milk Creek...

Read More Milk Creek Project: Greening Up Before Fall Rains Arrive

Проект "Милк-Крик": Вода течет по восстановленному руслу

The contractor and engineers worked closely today to return Milk Creek to the old channel.  Stream riffles that existed before the project were restored....

Read More Milk Creek Project: Water is Flowing in the Restored Channel

Milk Creek Project: Surface Seeded and Bank Shaping Underway

What a difference a day makes! Topsoil was spread today and raked to provide good soil-to-seed contact.  Straw mulch was placed to help with germination of...

Read More Milk Creek Project: Surface Seeded and Bank Shaping Underway

Milk Creek Project: Final Grade Achieved Today

The remainder of backfilling the structure was completed today, topsoil was replaced, and smoothing of the restored upper bank was started.  Tomorrow, the...

Read More Milk Creek Project: Final Grade Achieved Today

Milk Creek Project: Upstream End Finished to Final Grade

Now we can see what the finished log jam system will look like!  Contractors finished packing soil on the upstream end and graded the surface back to the...

Read More Milk Creek Project: Upstream End Finished to Final Grade

Проект "Молочный ручей": Мы видим, как это будет выглядеть

More logs, more slash, more boulders, more rock, more soil!  Excellent progress was made today on the log jam.  The upstream end is just about completed with...

Read More Milk Creek Project: We See How It Will Look

Milk Creek Project: Adding Materials to the Engineered Log Jam

We abbreviate “engineered log jam” as ELJ. The photos collected today show the final length of the structure, and the progression of work as slash,...

Read More Milk Creek Project: Adding Materials to the Engineered Log Jam

Проект "Молочный ручей": Установлены последние бревна основания

The last base logs were added today and most of the cross-logs with root wads attached were added.  Today you can see how the project sweeps along the curve...

Read More Milk Creek Project: Last Base Logs Installed

Проект "Милк-Крик": Бревенчатый затор начинает заполняться

Quite a bit more of the engineered structure became evident today as base logs and cross-members were extended farther downstream.  At the upper end, more...

Read More Milk Creek Project: Log Jam Starts to Fill-in

Проект "Молочный ручей": Добавлены живые ивы

Work today consisted of beginning to build up the roughness of the structure, because more friction means less erosive energy for flowing water.  This design...

Read More Milk Creek Project: Live Willows Added

Milk Creek Project: Making the Turn

More logs were placed today and we started to make the turn to follow the course of the stream.  In the photos below, you’ll find a few that show the...

Read More Milk Creek Project: Making the Turn

Milk Creek Project: Base Log Layer

Today the crew made great strides toward installing the base layer of logs in the large engineered log jam.  Trunks with roots attached were placed so the...

Read More Milk Creek Project: Base Log Layer

Milk Creek Project: First Logs Placed!

Today (Понедельник, Август 27, 2012) the contractor placed the first logs on the mudstone stream bottom.  As we build the engineered log jam, logs with roots still...

Read More Milk Creek Project: First Logs Placed!

Milk Creek Project: Mobilization (gallery)

Our contractor — Aquatic Contracting, LLC — arrived on Четверг, Август 23, 2012 to begin mobilizing equipment, hauling wood, and establishing...